Factory-direct structural steel racks certified under European Harmonized Standards (CE 2435-CPR-8605159), designed for standard European EPAL footprints, cold storage thermal cycling, and heavy industrial duty cycles.
Heavy Selective
Cantilever Arm
Stacking Rack
Export Selective
Powder Coated
Weather Guard
Mobile Handling
Corrosion Guard
The Swiss industrial warehousing sector occupies a unique position in continental Europe. Operating outside the European Union single market yet deeply integrated through bilateral logistics corridors (such as the Gotthard Alpine axis and the Rhine port of Basel), Swiss industrial operators, 3PL distributors, and export manufacturers face unprecedented land premiums, stringent cantonal fire codes, and exacting workplace safety regulations enforced by SUVA (Schweizerische Unfallversicherungsanstalt). Consequently, selecting warehouse stacking racks and pallet infrastructure transcends basic capital expenditure: it requires structural verification under SN EN 15512 (Static Steel Storage Systems – Racking Design), SN EN 15635 (Operational Tolerances and Safety Auditing), and Swiss-specific seismic actions governed by SIA 261 (Société Suisse des Ingénieurs et des Architectes).
In high-capacity distribution centers across the Cantons of Zürich, Aargau, and Bern, floor loading must be modeled with structural rigor. A fully loaded 4-tier stacking rack carrying 1,500 kg per level exerts a concentrated vertical force of 60 kN over four tubular cup bases. If floor contact feet are improperly calculated, point loads risk punching shear failure on unbonded floor toppings or insulated floor slabs frequently found in modern Swiss energy-efficient Minergie-certified facilities.
Guangzhou Heda Shelves Co., Ltd. addresses this mechanical demand by designing flared base cups using cold-formed structural steel plates (minimum yield strength fy = 235 N/mm² up to 355 N/mm² for high-bay configurations) with engineered load-dispersal footprints. Our factory-controlled fabrication process strictly operates under CE CPR certification (No. 2435-CPR-8605159), ensuring every cold-rolled upright profile, interlocking saddle, and beam locking safety clip is tested against structural shear, deflection limits (L/200 criteria), and cyclic fatigue.
| Racking Topology | Standard Module Dimensions | Rated Safe Working Load (SWL) | Stacking Elevation | Swiss Norm Compliance (SIA / EN) | SUVA Inspection Rating |
|---|---|---|---|---|---|
| Heavy Duty Stacking Rack (Manurack) | 1540 × 1180 × 1700 mm (EPAL-1 optimized) | 1,200 – 2,000 kg / unit | 1 + 3 Levels (4 Tiers total) | SN EN 15512, SIA 261 Seismic Cat. 1–2 | Compliant Class A |
| Selective Pallet Racking System | Upright depth 1100 mm, Beams 2700/3600 mm | Up to 4,500 kg / beam pair | Up to 16.5 m clear height | SN EN 15620, EN 15635 Safety Standard | Compliant Class A |
| Heavy Cantilever Storage Arm | Arm lengths 800–1800 mm, I-Beam Core | 500 – 3,000 kg / individual arm | Up to 9.0 m free-standing | SIA 260 / SIA 263 Steel Construction | Reinforced Class S |
| Galvanized Cold-Store Stacking Module | 1400 × 1000 × 1600 mm (Industrial Pallet) | 1,500 kg / tier (-30°C rated) | 1 + 4 Levels (5 Tiers total) | EN 1461 Hot-Dip Zinc Coating | Compliant Class A |
In the pharmaceutical clusters of Basel-Stadt, Basel-Landschaft, and the Lake Geneva region (BioAlps corridor), active pharmaceutical ingredients (APIs) and biotherapeutics require cold-chain warehousing regulated under Swissmedic GDP guidelines. Traditional bolted pallet racks suffer from micro-corrosion at unsealed bolt apertures due to persistent condensation cycles during defrost intervals. Furthermore, standard electrostatic powder coats may develop micro-fissures below -20°C, shedding microscopic paint particulates that compromise ISO 14644 cleanroom standards.
Our CE-certified racking lines undergo multi-stage surface pretreatment including automated chemical pickling, zinc phosphating, and thermo-cured electrostatic polyester coatings tested against salt spray and moisture penetration. For ultra-low refrigeration and ambient sub-zero logistics, Heda Shelves supplies continuous hot-dip galvanized finishes complying with EN ISO 1461, eliminating VOC emissions, preventing zinc peeling, and guaranteeing structural ductility down to -35°C.
From precision watchmaking micro-storage to heavy machinery export buffer yards along the Mittelland transit belt.
Pharmaceutical exporters utilize our RoHS-compliant, high-finish powder coated stacking racks for raw material batch staging, ensuring zero volatile contamination, seamless forklift access, and direct compliance with Swissmedic storage inspections.
Machinery builders (MEM industries) handle cast components and complex tooling on our heavy-duty I-beam cantilever and selective racks, supporting safe vertical consolidation without risk of column deflection under high dynamic loads.
Located in Switzerland’s primary multimodal distribution core, 3PL logistics providers install demountable manuracks to rapidly adjust seasonal buffer capacity between road transit and SBB Cargo rail freight corridors.
Catering to rapid distribution along the Geneva-Lausanne axis and alpine transit routes to Northern Italy, high-turnover selective pallet racks maximize SKU accessibility while meeting SUVA operator-protection clearances.
Key operational evolutions driving investment decisions among Swiss supply chain directors.
Swiss operators are phasing out inflexible, permanent fixed-aisle systems in favor of hybrid designs that combine perimeter heavy selective racks with modular, stackable post pallets in central picking arenas for dynamic seasonal scaling.
Swiss accident insurance guidelines mandate rigorous annual inspections for upright deformation (Green, Amber, Red hazard thresholds). Stacking racks must provide certified load capacity plaques and positive mechanical interlocking to prevent accidental dislodgement.
Swiss corporate ESG mandates require fully traceable, recyclable structural steel (Q235B/Q355B equivalent to S235JR/S355JR under EN 10025) backed by mill test certificates (MTC 3.1) and eco-friendly, lead-free powder coating chemistries conforming to RoHS.
Backed by over two decades of heavy industrial rack manufacturing and global export compliance.
Equipped with 10 automated cold roll-forming lines, automated punching matrices, robotic GMAW welding stations, and an advanced 400-meter automated electrostatic powder coating tunnel ensuring uniform dry film thickness (60–80 μm).
Fully compliant with the European Construction Products Regulation under CE Certificate No. 2435-CPR-8605159 and ISO 9001:2015 Certificate No. 18624Q00169R0M, providing Swiss building control and insurance bodies with complete legal verification.
Our bilingual technical design department generates accurate 2D warehouse CAD layout schematics, 3D structural visual renders, and finite element analysis (FEA) deflection reports tailored to your specific forklift turning radii and ceiling clearance.
Key information concerning Swiss import customs, pallet dimension compatibility, and SUVA safety compliance.
Yes. Our modular stacking racks and selective racking bays are precisely sized for EPAL 1 (1200 × 800 mm) and EPAL 2 / Swiss industrial pallets (1200 × 1000 mm). The inner clearance of our standard base frames provides adequate forklift fork approach margins and stops pallet overhang, eliminating collision risks during high-reach placement.
Every delivery includes official CE Factory Production Control (FPC) documentation, material chemical and mechanical test sheets, safe working load (SWL) static calculation dossiers, and self-adhesive aluminum load warning signage (Belastungsschilder) showing tier capacities according to SN EN 15635.
Although Switzerland is outside the EU customs zone, our export logistics team prepares complete HS-code documentation (HS 73089000 for steel structures), commercial invoices, EUR.1 / Origin Declarations, and container packing manifests. Goods arrive via Antwerp/Rotterdam with seamless rail or road transit to major Swiss customs inland terminals (e.g., Basel, Zurich, Rekingen).
Yes. Cantons situated in higher seismic risk areas (such as Valais/Wallis or parts of Basel) require localized dynamic earthquake calculations. Our structural engineering department incorporates customized cross-bracing diagonals, heavy gauge baseplates, and reinforced anchor points in accordance with SIA 261 and EN 16681 guidelines.
Standard project fabrication takes 15 to 22 business days following CAD drawing sign-off at our 30,000 m² factory. Maritime transit to European container ports requires 26 to 32 days, followed by inland multimodal transfer to Swiss sites, totaling approximately 7 to 9 weeks door-to-door.
Each shipment includes comprehensive bilingual (English/German) assembly manuals, structural connection exploded diagrams, and complete hardware inventories. For complex mezzanine platforms and high-bay installations, we offer step-by-step remote engineering video support and on-site engineering supervision.
Send our structural logistics engineering team your warehouse CAD layout, ceiling clear heights, and pallet load profiles. We will supply a complete 2D/3D storage design proposal, load-deflection static analysis, and CIF Swiss freight quotation within 24 hours.